Find out in 60 seconds β before you spend $7,500 on consultants to answer a yes/no question.
Your result is ready.
We've checked zone rules, flood overlays, slope, stormwater infrastructure, and lot size viability.
Pay $79 to unlock your full report.
Enter your address β we check zone rules, overlays, lot size, slope and drainage in seconds
Pay $79 β see your GREEN / AMBER / RED result with plain-English explanations and cost estimates
Get your PDF report β know exactly which consultants to call, in what order, and what it'll cost
We attempted to subdivide a Brisbane lot in 2024. First the town planner said "should be possible." We engaged a surveyor, then a hydraulics engineer for a full RPEQ-signed TUFLOW report. Total spend: $7,500. Then the engineer confirmed the flood overlay made the rear lot commercially unviable. Nobody surfaced that constraint upfront. SubdivideIQ is the pre-screen that would have saved us that $7,500.